29.06.2007
The Millennium ban lifted! See details on http://www.millennium-series.com/

more  >>

22.06.2007
In response to recent events at Millennium in Germany we have called a technical audit of our production facilities by TÜV-Nord...

more  >>

21.06.2007
We are launching www.stakopaintball.com website. We hope for better integration and positive receipt in Paintball World.

more  >>


The design of our tanks starts with analytical calculation (predimensioning). Then we do simulations with Abaqus software which shows the behaviour of the tank in different conditions. The design that is proven by FEM (Finite Elements Method) is tested during prototyping phase.

All our designs undergo LBB (Leak Before Break) procedure. That means the tank is designed in the way that even broken or unsealed they do not burst open but slowly go empty.

Engine.pl